Sample content: these example case studies will be replaced with the company’s own projects before launch.
Fitzrovia, Central London
An occupied office floor where most windows no longer opened or locked. We carried out the work after 6pm over two evenings: replacing handles and locking gear, renewing gaskets, freeing stiff hinges and replacing two cracked units, with the floor fully usable by each morning.
What we did
- Surveyed the floor during one lunchtime and agreed an evening schedule with the office manager.
- Replaced fourteen handles and nine locking mechanisms, renewed gaskets on every opening window and freed the stiff hinges.
- Replaced two cracked sealed units on the second evening.
The result
Every window opens and locks, with no disruption to the working day.
- Out of hours
- Aluminium
- Locking gear
- Commercial